Story points when coding agents write the code
If a coding agent now writes a good share of your team’s code, typing is no longer the slow part. The work that remains is deciding what to build, checking what came back, and getting it safely into production. Your estimates can follow that shift, and you can check whether they do.
What a point measures now
Story points were always relative size: effort, complexity and uncertainty together. When an agent drafts the code, the effort moves. A change that once took two days to write may take an hour to generate, and then a day to understand, test and trust. What still takes the team’s time is mostly:
- Review. Reading a diff you didn’t write, in a part of the code you may not know well.
- Verification. Tests that really cover the change, manual checks, a look at edge cases the agent didn’t think of.
- Integration. Migrations, other teams’ services, feature flags, rollout and rollback.
- Unknowns. Unclear requirements are as unclear as before. An agent will happily build the wrong thing quickly.
So the useful question during the estimate is less “how much code is this?” and more “how hard will it be to be sure this is right?”. A small diff in billing code can be riskier than a large one in a settings page.
Try a deck that asks that question
You can keep your usual deck and simply estimate with review and verification in mind. If the numbers keep pulling people back to “how long to write it”, try the Review risk deck in PointHuddle: Trivial, Low, Medium, High and Unknown. Like T-shirt sizes, the cards have no numbers, so nobody adds them up into hours.
- Trivial: a glance at the diff is enough; a mistake would be obvious and cheap.
- Low: a normal review and the existing tests cover it.
- Medium: needs new tests or a careful read of behaviour you rely on.
- High: data, money, security or other teams are involved; it needs a slow review and a plan to roll back.
- Unknown: works like the “?” card. Nobody can judge the risk yet, so the story needs clarifying or a spike first. It isn’t counted in accuracy or in the spread.
Pick the deck when you create a room, or change it later in Room settings → General → Deck. Agree on what each card means in your codebase, and pin an example story to each card so the meaning stays put. When the cards spread wide, the conversation is the point: ask the lowest and highest voters what they are worried about.
Tag the stories an agent mostly built
Not every story is built the same way, and mixing them hides what is going on. In PointHuddle, whoever runs the room can mark a story Agent-assisted: in the Summary tab next to the story’s actual, or from the story’s ⋯ menu in the Stories list. Set it when you know how the work went, usually when you record the actual; it isn’t asked at accept or read from tracker labels. Agree once what “mostly built by an agent” means for your team: a loose definition makes the comparison worthless.
Compare accuracy separately, over a few sprints
Once the work is done, record what each story really took, as in estimate vs actual: type a card or a number in the Summary tab, or pull actuals from Jira or Azure DevOps. When the room has actuals for both kinds of story, the Stats tab shows estimate accuracy (within one card, and which way you miss) for agent-assisted and other stories side by side, with how many stories each side has. Team rooms also show both in the accuracy trend across sessions.
Read those numbers with care:
- Count first. Four stories on one side tell you very little. PointHuddle says so when a side has fewer than five. Wait for a few sprints before you change how you estimate.
- Look for a direction, not a score. If agent-assisted stories keep running longer than estimated, the review and verification are probably bigger than the team assumes. If they keep running shorter, you may be estimating the typing you no longer do.
- Compare the team with itself. Never people, and never one team with another.
The exports carry an Agent-assisted column too, so you can take the data into your own spreadsheet.
Expect your velocity baseline to move
If points now measure review risk, or the agent makes some work much faster, the number of points per sprint will change. That isn’t the team getting better or worse, it is the unit changing. Some practical consequences:
- Don’t compare velocity from before the switch with velocity after it. Treat the change as a new baseline and give it a few sprints.
- If you change decks, start a new session in the room so trends don’t mix the old scale with the new one.
- Keep estimates as a planning tool. Using them to judge how much the agent “saves” turns them into a target, and targets stop being honest estimates.
A simple way to start
- Agree as a team what “agent-assisted” means for you.
- Estimate the next sprint with review and verification in mind, on your usual deck or the Review risk deck.
- After the work is done, record actuals and tag the agent-assisted stories.
- After three or four sprints, look at the two accuracy numbers together in a retrospective, and adjust what you talk about during estimation.